top of page
Team of Engineers _edited_edited.jpg

BDB BRIDGE TEAM

Our Story

BDB Bridge specializes in the design and rental of temporary structures and equipment, primarily for the bridge construction industry. We stand apart from the competition by delivering pre-engineered and preassembled structural systems that require minimal handling and connection time to erect. The result is significant time and labor savings for the contractor. BDB’s mission is to make money for clients!

​

This mission is accomplished through effective communication and planning, and equipment innovation. One example is our HYDRA-TOWER™, which makes splicing girders and bearing replacements easier and faster than ever. BDB tops it off with the ability to value engineer a project to the extreme, while being mindful of constructibility, the contractor’s capabilities, and the bottom line.

Meet The Team

Gary-Profile-Photo.jpg

Gary M. Dinmore, P.E.

Co-Founder

thumbnail_DSC_1007.jpg

Mike J. Duncan

Sales Executive

26195463_547218248961988_7302308653581473543_n.jpg

Bryan T. Flok

Distribution Manager

IMG_1446[1888].jpg

Missy Duncan

Executive Director

JOE .jpg

Joe Tocci

Vice President of Sales

© 2021 by BDB Bridge.

bottom of page